Thorburn Associates is proud to have worked on a variety of projects throughout our first 25 years!
2007: County of Kern Emergency Operations Center, Bakersfield, California. The 7,000 sq ft standalone facility is designed to be the command center for county operations during a disaster/emergency situation. The three principal areas include the emergency operations center, media room/joint information center, and conference room. TA provided audiovisual consulting for the center including computer stations, eight 58″ flat panel displays, projectors, loudspeakers and wireless touch panels.
2008: Greenbridge Mixed-Use Complex, Chapel Hill, North Carolina. The ten story, 240,000 sq ft facility has two levels of parking below grade, retail in the first floor and luxury condominiums on the upper floors. TA provided sound isolation and mechanical noise and vibration control services for the facility. The Greenbridge Complex was designed for LEED Gold Level Certification.
2009: Duke Energy Tryon Tower, Charlotte, North Carolina. The 786-foot tall, 48-floor skyscraper is the second tallest building in Charlotte. TA’s services included a review of the room acoustics, sound isolation, and mechanical noise and vibration. We determined which spaces required sound masking and developed the design. the audiovisual design included 17 typical floors, one legal floor, one multi-use floor and the executive office floor.
To see our favorite projects from 2004-2006 click HERE