Image

Focus on Technology: Visual Presentation Spaces, Part I Understanding the 468 Rule

August 1, 2010   
Designing presentation facilities can be challenging, but the basic principles are not difficult. Each project and venue comes with its own set of variables and limitations that require some analysis to determine how to create the most optimal conditions. The
Image

Project Profile: The Littoral Warfare Training Center Briefing Room

June 1, 2010   
The Littoral Warfare Training Center Briefing Room at Marine Corps Base Camp Lejeune is undergoing a comprehensive architectural modernization, replacement of the mechanical systems, and an update of the audiovisual technology. The facility is primarily used to train military personnel
Image

Focus on Technology: Design Build vs. Design Bid for Technology

April 1, 2010   
It is a common question: Should I have it designed or should I just go to a vendor to have the technology installed? When you break the question down, it comes down to Design (Planning) or Contracting (Building). Are design
Image

Project Profile: Research Triangle Institute

February 1, 2010   
Thorburn Associates was pleased to work with Research Triangle Institute (RTI) on their Building 8 Auditorium. Approximately 200 seats, the project was built by Duke Construction. TA provided both audiovisual and acoustical consulting for this user-friendly meeting and briefing space.
Image

Product Review: Desktop Visualizer VZ-9plus3

December 1, 2009   
Before PowerPoint, there was the overhead projector, and you may well remember its use in the classroom when you were growing up. Whatever happened to the overhead projector? It grew up and became the WolfVision Visualizer. This straightforward, user-friendly presentation
Image

Project Profile: USF Joint Military/ROTC Building

December 1, 2009   
Thorburn Associates was honored to be on the team for the University of South Florida’s most technologically advanced educational facility, located in Tampa. TA was engaged by USF to design the audiovisual systems for this state-of-the-art facility. The building’s five
Image

Focus on Technology: Overhead Microphone Systems

December 1, 2009   
Your ears are really good acoustical measurement tools. Sit in a space alone sometime, clear your mind, and see how many different sounds you can identify. Very often, you will be able to pick out five or six sounds and
Image

Focus on Acoustics: Containing Fan and Duct Noise

December 1, 2009   
During a recent tour of an existing campus, we were shown a classroom that was in the process of having a complete, bells-and-whistles audiovisual package installed to support a distance learning program. However, our project meeting quickly took an unscheduled
Image

Project Profile: Kern County Emergency Operations Center

October 8, 2009   
Working with BFGC Architects Planners Inc., TA recently provided acoustical and audiovisual consulting services for the new County of Kern Emergency Operations Center (EOC) located in Bakersfield, CA. This standalone facility, nearly 7,000 square feet in size, is designed to
Image

Safe Disposal Of Green Rhetoric

August 18, 2009   
I admit it. I’m tired of being lectured to about green building and sustainability. I’m not tired of the concepts; I like to think that I have subscribed to and enacted sustainable practices in my life and work for many