Image

Project Profile: San Ramon Valley United Methodist Church Recreation Center

July 20, 2017   
San Ramon Valley United Methodist Church Recreation Center (ARC) has been a long time coming. What was anticipated to be a simple addition to the San Ramon Valley Institution, founded in the late 1940’s, when the valley was all ranch
Image

Project Profile: HSM StoneCrest

June 27, 2017   
Thorburn Associates recently partnered with Hilliard Studio Method (HSM) to provide the acoustical design of their new HSM|Core fitness studio at StoneCrest in Charlotte, NC.  HSM features classes with a unique approach to resistance training.  As more and more people
Image

The Elusive System Check Out

October 17, 2011   
Increasingly, in both our home and work environments, we live in a world of automation. And, accordingly, our demands have risen just beyond the limits of reasonable expedemands ctation. Is it any wonder, then, that we frequently hear “What do
Image

Focus on Technology: Visual Presentation Spaces, Part I Understanding the 468 Rule

August 1, 2010   
Designing presentation facilities can be challenging, but the basic principles are not difficult. Each project and venue comes with its own set of variables and limitations that require some analysis to determine how to create the most optimal conditions. The
Image

Project Profile: The Littoral Warfare Training Center Briefing Room

June 1, 2010   
The Littoral Warfare Training Center Briefing Room at Marine Corps Base Camp Lejeune is undergoing a comprehensive architectural modernization, replacement of the mechanical systems, and an update of the audiovisual technology. The facility is primarily used to train military personnel
Image

Project Profile: California Science Center

April 1, 2010   
Patrick Gallegos of Gallegos Lighting, now a Thorburn Associates Studio, unveiled his most recent project at the California Science Center on March 25. The museum’s new wing, called Ecosystems, surrounds guests with the sensations of each Ecosystem environment, eliciting an
Image

Project Profile: Research Triangle Institute

February 1, 2010   
Thorburn Associates was pleased to work with Research Triangle Institute (RTI) on their Building 8 Auditorium. Approximately 200 seats, the project was built by Duke Construction. TA provided both audiovisual and acoustical consulting for this user-friendly meeting and briefing space.
Image

Project Profile: USF Joint Military/ROTC Building

December 1, 2009   
Thorburn Associates was honored to be on the team for the University of South Florida’s most technologically advanced educational facility, located in Tampa. TA was engaged by USF to design the audiovisual systems for this state-of-the-art facility. The building’s five
Image

Project Profile: Kern County Emergency Operations Center

October 8, 2009   
Working with BFGC Architects Planners Inc., TA recently provided acoustical and audiovisual consulting services for the new County of Kern Emergency Operations Center (EOC) located in Bakersfield, CA. This standalone facility, nearly 7,000 square feet in size, is designed to
Image

Project Profile: Quintiles

August 1, 2009   
Quintiles Transnational, which helps pharmaceutical, biotechnology and medical device companies develop and market innovative therapies, recently celebrated the grand opening of its new headquarters in Durham, North Carolina. At 252,000 square feet, the new, 10- story, glass-and-concrete structure, with room